Laserfiche WebLink
? J&T Consulting, Inc. Broken Arrow Investments, LL <br />Derr <br />Bond Quantities and Costs <br />07123 Derr Pit Rec Bond Calcs 8.17.1 <br />Phase 5 (9.71 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Minina Area <br />Credit for Slurry Wall Required to Close Phases 2-4 (4,954) If $ 470.00 $ (2,328,380) <br />Slurry Wall Required to Close Phases 2-5 4,922 If $ 470.00 $ 2,313,340 <br />Additional Dewatering Req'd for Combined Phases 2-5 Area 111.6 Mil. Gal. $ 200.00 $ 22,320 <br /> Total Direct Cost $ 7,280 <br />Overhead and Profit Cost (12.60%) $ 917 <br />Contract Cost 8,197 <br />Project Management (9.25%) $ 758 <br />4 of 4