My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-23_REVISION - M2008017 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008017
>
2010-08-23_REVISION - M2008017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:35 PM
Creation date
8/24/2010 8:07:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
REVISION
Doc Date
8/23/2010
Doc Name
Submittal
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. <br />ion Bond Quantities and Costs <br />Broken Arrow Investments, LLC <br />Derr Pit <br />8/17/2010 <br />07123 Derr Pit Rec Bond Calcs 8.17. <br />Summary of Unit Coats <br />Direct costs <br />Re-applying topsoil 6" thick <br />Revegetating disturbed area <br />Dewatering full pit <br />Slurry Wall Cost (85 foot average depth) <br />(0-50 ft @ $3/ft - 51-70 ft @ $41ft - 71-85 ft @ $161ft) <br />Scarifying Ground <br />Mobilization <br />$1,800.00 / acre <br />$1,000.00 /acre <br />$200.00 / million gallons <br />$470.00 / linear foot <br />$200 / acre <br />$2,500 lump sum <br />Overhead and Profit Costs <br />Liability insurance 1.55% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br /> Total Overhead Cost 12.60% of direct cost <br />Proiect Management <br />Engineering and bidding 4.25% of direct cost <br />Management and administration 5.00% of direct cost <br /> Total Additional Cost 9.25% of direct cost <br />1 of 4
The URL can be used to link to this page
Your browser does not support the video tag.