Laserfiche WebLink
J&T Consulting, Inc. <br />ion Bond Quantities and Costs <br />Broken Arrow Investments, LLC <br />Derr Pit <br />8/17/2010 <br />07123 Derr Pit Rec Bond Calcs 8.17. <br />Summary of Unit Coats <br />Direct costs <br />Re-applying topsoil 6" thick <br />Revegetating disturbed area <br />Dewatering full pit <br />Slurry Wall Cost (85 foot average depth) <br />(0-50 ft @ $3/ft - 51-70 ft @ $41ft - 71-85 ft @ $161ft) <br />Scarifying Ground <br />Mobilization <br />$1,800.00 / acre <br />$1,000.00 /acre <br />$200.00 / million gallons <br />$470.00 / linear foot <br />$200 / acre <br />$2,500 lump sum <br />Overhead and Profit Costs <br />Liability insurance 1.55% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br /> Total Overhead Cost 12.60% of direct cost <br />Proiect Management <br />Engineering and bidding 4.25% of direct cost <br />Management and administration 5.00% of direct cost <br /> Total Additional Cost 9.25% of direct cost <br />1 of 4