My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-18_REPORT - M1998024
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1998024
>
2010-08-18_REPORT - M1998024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 11:42:45 AM
Creation date
8/20/2010 11:20:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998024
IBM Index Class Name
REPORT
Doc Date
8/18/2010
Doc Name
Annual Fee/Report/Map
From
Oldcastle SW Group, Inc
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CFIVED <br />- - - - - - -- - - --- V- -AUG-18-2010 --- <br />{?^t\^?v'?'? Division of keaination, <br />Mining and Safety <br />Greg Lewicki And Associates N _ ) qq? _ <br />11541 Warrington Court Phone (303) 346-5196 Fax: (303)-346-6934 <br />Parker, CO USA 80138 E-Mail:info@lewicki.biz <br />August 10, 2010 <br />Mary Rodriguez <br />Colorado Division of Reclamation, Mining and Safety <br />Minerals Section <br />1313 Sherman Street 2nd Floor <br />Denver, CO 80203-2273 <br />0 Rj? , ? A L) <br />Re : Annual Report B&B Excavating, Inc. Hidden Valley Pit <br />MLR.No._M-98_024__ _ <br />Dear Mary: <br />Enclosed is the Annual Report for the past year for The Hidden Valley Pit of B&B <br />Excavating, Inc., including map and report form. Past records show that the annual date <br />for the pit is August 3 of each year. The financial warranty for the permit is $83,155 and <br />the total permit area is 183.6 acres. Eagle County has permitted the full operation so now <br />the DRMS permit exactly coincides with the Eagle County Special Use permit. The <br />former operation area was limited to 31.3 acres as shown on the enclosed map. The <br />mining and reclamation plan is phased. <br />The following information is provided to comply with Rule 2.4.1: <br />(1) Mining did take place in the previous year in the area immediately west of the <br />plants. An approximate area of 1.7 acres was stripped for additional mining north <br />of the northwest corner of the disturbance area. Topsoil from this stripping was <br />stockpiled along the east edge as shown on the Annual Report Map. The total <br />current disturbance is now 31.3 acres. The excavated pit and some stockpiles do <br />exist on site. All topsoil and overburden has been stripped and placed in berms <br />around the pit as planned in the permit. In addition, the existing disturbance <br />consists of the access road, sediment sump, a truck scale and scale house/office <br />trailer has been set up as shown on the enclosed Annual Report Map. A portable <br />crusher/screen plant with a 10,000 gallon diesel tank is brought to the site for <br />processing A few months per year. An 8,000 gallon tank has been installed for the <br />diamond jaw crusher and a 6,000 gallon tank has been installed for the wash
The URL can be used to link to this page
Your browser does not support the video tag.