Laserfiche WebLink
Mr. Allen Sorenson - DRMS <br />July 30, 2010 <br />Page 2 <br />CIVIC requests construction approval from the DRMS, which is scheduled to begin in August 2010 and <br />last for approximately 5 months. A project summary report, as-built drawings and project certification will <br />be provided to the DRMS upon project completion. <br />Preliminary design drawings are included as Attachment 1. <br />Please contact me at (303) 569-3221, ext. 1233 or Bryce Romig (ext. 1204) if you require additional <br />information or if you have any questions or concerns. <br />Sincerely, <br /> <br />Miguel Hamarat <br />Chief Environmental Engineer <br />Climax Molybdenum Company <br />Henderson Operations <br />Enclosures: <br />1. Preliminary Design Drawings <br />CC: B. Romig, Climax <br />T. Haynes, Climax <br />M. Kneel, Climax