Laserfiche WebLink
Table 2.06.6 -1 Rule 2.06.6 Requirements <br />Item <br />Location of Response <br />A -Soil Survey and Identification of Prime <br />Section 2.04.9: <br />Farmlands <br />sub - section 10.0 <br />Attachment 2.04.9 -6 <br />B - Topsoil Removal and Replacement <br />Section 2.04.9: <br />Methodology <br />sub - sections 16.4 & 16.5 <br />Section 2.05.4(2)(d): <br />sub - sections 11.0 <br />C - Topsoil Stockpile and Storage Plans <br />Section 2.05.4(2)(d): <br />sub - section 8.0, 12.1 & 13.1 <br />Maps 2.05.4 -4, 2.05.4 -6, & 2.05.4 -8 <br />D - Suitable Subsoil Documentation <br />Section 2.05.4(2)(d): <br />sub - section 6.0, 7.0 11.0 & 14.0 <br />Attachment 2.05.4(2)(d) -1 <br />E - Revegetation Plans <br />Section 2.05.4(2)(e): <br />sub - sections 5.0 & 9.0 <br />Map 2.05.4 -5 <br />F - Certification of Proposed Plans <br />Attachment 2.04.9 -6 &Attachment <br />2.05.4(2)(e) -11 <br />G - NRCS Determination of Prime <br />Attachment 2.04.9 -6 <br />Farmland Productivity <br />H - Return of Soil Productivity <br />Section 2.05.4(2)(e): <br />sub - sections 5.6, 5.7 5.5.2 5.5.3 & 5.5.4 <br />Section 2.05.4(2)(d): <br />sub - sections 13.1 & 14.0 <br />Attachment 2.05.4(2)(e)-3 <br />(Revised June 2010) 2.04.9 -4 <br />