My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C, Triangle Liner Cert.- Apend. D- Tech Specs
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
? amec'* <br />¦ monitor and document material placement, including soil type, particle size, loose lift <br />thickness, moisture conditioning process, compaction equipment and methods used to attain <br />compaction, including number of passes, uniformity of compaction coverage, compacted lift <br />thickness, bonding of lifts and in-place moisture content and dry density is in compliance with <br />the SPECIFICATIONS; <br />¦ monitor Soil Liner Fill surface preparation to verify that the surface has been proof-rolled, <br />compacted, or handworked so as to be in a condition suitable for geomembrane installation as <br />discussed in Section 02200 of the SPECIFICATIONS; <br />¦ monitor Bedding Fill placement and surface preparation to verify that the surface is suitable <br />for geomembrane installation as discussed in Section 02200 of the SPECIFICATIONS; <br />¦ monitor the placement of fill to ensure that CONTRACTOR exercises care in the vicinity of <br />pipes and that the underlying geosynthetics are not damaged; <br />¦ monitor and document CONTRACTOR verification of in-place Soil Liner Fill, Bedding Fill, <br />Low Volume Solution Collection Fill and Drain Cover Fill thickness; <br />¦ monitor equipment being used to place Low Volume Solution Collection Fill and Drain Cover <br />Fill to verify that the CONTRACTOR places the material in accordance with the <br />SPECIFICATIONS; <br />¦ monitor that Low Volume Solution Collection Fill and Drain Cover Fill is pushed uphill for <br />areas in which the slope exceeds 4H:1 V and that the dozer does not perform unacceptable <br />pivot turns; and <br />¦ monitor the fill temperature as identified in Section 02200 of the SPECIFICATIONS. <br />PART 7: DOCUMENTATION <br />Documentation kept by the CQA Monitor shall consist of daily record-keeping, construction problem <br />resolutions, design and SPECIFICATION changes, photographic records of construction, weekly progress <br />reports, chain of custody forms for test sample tracking, and a Construction Certification Report. <br />7.01 DAILY RECORD KEEPING: <br />Daily records kept by the CQA Monitor shall consist of field notes, observation and testing data sheets, <br />summary of the daily meeting with CONTRACTOR, and reporting of construction problems and resolutions. <br />The CQA Monitor shall submit this information on a regular basis to MANAGER for review. <br />7.02 SOILS OBSERVATION AND TESTING FORMS: <br />The CQA Monitor will document soils observations on forms that generally include the following information: <br />¦ date, project name, location, and weather data, including high and low daily temperatures; <br />a site plan showing work areas and test locations; <br />' descriptions of ongoing construction detailing work areas and equipment utilized by <br />CONTRACTOR; <br />Section 01400.1 Page 6 of 9 September 3, 2008 <br />Earthworks CQA Plan Revision 1 <br />SAProjects\1125E CCV CQA\I -Tech Specs\01400.1.rl.doc
The URL can be used to link to this page
Your browser does not support the video tag.