My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C Triangle Liner Cert.- Cover to Append. C, Weekly Rpts.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />' Quality Assurance Monitoring and Test Results <br />Phase 4B/C Triangle Liner Certification <br />August 10, 2010 <br />List of Tables <br />amecO <br />Table 1 Summary of Earthworks Material Specifications <br />Table 2 Summary of Weather Data <br />Table 3 Earthworks CQA Test Summary and Testing Frequency <br />Table 4 Phase 413/4C Triangle Soil Liner Fill Laboratory Testing Summary <br />Table 5 Phase 413/4C Triangle Drain Cover Fill Laboratory Testing Summary <br />Table 6 Phase 413/4C Triangle Nuclear Density Laboratory Testing Summary <br />Table 7 Phase 413/4C Triangle Soil Liner Fill Depth Verification <br />List of Figures <br />Figure 1 Certification Area <br />Figure 2 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />Figure 3 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />Figure 4 Phase 413/4C SLF Layout <br />Figure 5 Phase 413/4C Triangle Panel Layout <br />Figure 6 Phase 413/4C DCF Layout <br />List of Appendices <br />Appendix A Photographic Documentation <br />Appendix B Staff Schedule for Personnel <br />Appendix C Weekly Reports <br />Appendix D Technical Specifications <br />Appendix E Subgrade Acceptance Forms <br />Appendix F CQA Laboratory Test Results <br />Appendix G Geomembrane Quality Control Documents and Inventory <br />Appendix G-1 Geomembrane Inventory Control <br />Appendix G-2. Resumes of Installation Personnel <br />Appendix G-3 Geomembrane Resin Quality Control Certificates <br />Appendix G-4 Geomembrane Roll Quality Control Certificates <br />Appendix G-5 Welding Rod Quality Control Certificates <br />Appendix H Geomembrane Installation Observations <br />Appendix H-1 Geomembrane Deployment Observations <br />Appendix H-2 Geomembrane Trial Seam Summaries <br />Appendix H-3 Geomembrane Fusion and Extrusion Welding Summaries <br />SAPROJECTS\1125E CCV CQA\H2 - DESIGN\TRIANGLE\FINAL\TRIANGLE CERTIFICATION REPORT FINAL REVI.DOC
The URL can be used to link to this page
Your browser does not support the video tag.