Laserfiche WebLink
- WESTERN FUEL S - COLORADO <br />0' 300' 600' 900' LIMITED LIABILITY COMPANY <br />iwnov, <br />JUNE 20 PIT ARFA AS OF NEW HORIZON MdNE <br />JUNE 2oi0 .. w „ <br />P.0 Box 628, NUCLA, CO. 81424 <br />, <br />ZONE 1 - 12.21 acres <br />''- SUBSOIL,: BENCH 1 SUBSTITUTE SUBSOIL <br />MAP 2.05.4.6 MORGAN PROPERTY <br />ZONE 4 - 54.33 acres ; 33" AVG. THICKNESS1 <br />suB sOlL: LIFT B 8,oIL ALL PLACED AS OF JUNE 2010 TOPSOIL REPLACEMENT PLAN <br />°t L.! <br />33" AVG. THIG KNESS; �`pW,� <br />k NONE PLACED AS. OF JUNE 2010 i TOPSOIL: MIXED TOP SOIL :(D� 20335 - AS OF JUNE 2010 <br />-21" AVG. tHickNEOS �> <br />TOPSOIL: LIFT A SPIL, ZONE 3 - 31.68 acres <br />15" MINIMUM THICKNESS � ., > ' °3� DWG. DATE: REV. NO. <br />I SUBSOIL: LIFT B SOIL ', ° <br />`I5" MINIMUM',. THICKNESS 17" OF TOPSOIL PLACED'AS OF JUNE DNT. INTERVAL: CONT. DATE: REV. DATE: B /9/2010 <br />25 A�IGJ b DRAWN BY: CHKD BY: DWG. NO.: <br />" ' THICKNESS j 33" AVG. THICKNESS <br />h <br />Ben Longenfeld, EIT <br />NONE P� CED A$ OF JUNE 20101 ALL PLACED AS OF JUNE 2010 <br />I I <br />I <br />No LJt A or Lift B etnp ins from Pond 011 � I <br />p � ;TOPSOIL: MIXED TOPSOIL <br />area, <br />15 „ MINIMUM THICKNESS N <br />x, <br />POOP iE'srocKPiLEUn –29” AVG. THICKNESS <br />LIFTae'B6 C NONE P CED AS OF JUNE 2010 <br />PROPOSED <br />POND 011- <br />_ <br />, q STOCKPILE #18 <br />Pond Oil _ - -- -LIFT 7.250 CY <br />3. 19 acres <br />PpOI 0, ED <br />....P <br />PON 0 1 PRO ZONE <br />�.. : i STCiCKPIi. 15, / ' <br />AREA OF SOIL loc l< l r_.,t19 i w / ! <br />J – LlFijp Af 64o,�Y s74c�PIL 1z 12.21 <br />r P N hi 113,26000 / 221 518 CY > <br />'6" STRIPPING REMAININ / //� <br />� /i <br />' <br />/ / / / / / / //� 25�/// <br />AFTER JUNE 2010 ZONE 3 `'t j� r / <br />Al / <br />° 2 // //i /'� //i /i /i / // <br />31.68 AC <br />Ate- / / / <br />o 4' �• 7,.84 K <br />triF: <br />`:� <br />J aAPPROX. <br />PITAREAASOF PROPOSE <br />JUNE 2010 I STOCKPILE 14 <br />E LIFT A 39,4.566Y <br />h <br />i ft A & B Undisturbed: <br />o ZONE 2 - 7.84 acres <br />26.11 acres <br />;3 ! SUBSOIL: BENCH 1 SUBSTITUTE SUBSOIL <br />a o 33" AVG. THICKNESS o <br />A ALL PLACED AS OF JUNE 2010 W <br />Lift B only <br />Undisturbed: 1.72 acres TOPSOIL: MIXED TOPSOIL, 6 <br />v21 "AVG. THICKNESS -- - -- — - -- -- - a <br />s` PROPOSED 15" MINIMUM THICKNESS - <br />Bench 1 stockpile for last 3 mine <br />I � (NONE PLACED AS OF JUNE 2010 <br />pits <br />ZONE 5 5676 <br />16hk <br />1.90AC �/ last 3 cuts x 115' x 1700ft1 x = <br />( <br />132,222 cy stockpile <br />ZONE 5 <br />1.90 AC <br />UNDISTURBED <br />BECAUSE OF N <br />I <br />BLASTING RESTRICTIONS 5 <br />66 <br />i <br />i <br />i <br />I 6� I <br />5 <br />I h 0 <br />r <br />^h <br />Table A Table B Table C <br />2010 Topsoil Thickness of the yet to be disturbed land west of the TOPSOIL VOLUMES AVAILABLE AS OF MAY 2010 TOPSOIL VOLUMES REQUIRED IN EACH ZONE <br />active pit area. As of May 1, 2010 (Western portion of Zone 4) <br />2010 MIXED = 132,271 CY (STOCKPILES 5 8 6) + 27,906 CY (17" PLACED IN ZONE 1) = 160,176 CY (100% recovery) ZONE 1 -12.21 ACRES x 43560 SF /ACRE x 211N/121NlFT = 34,472 CY OF MIXED TOPSOIL <br />27 CF /CY <br />Sample No. Lift A (inch) Lift B (inch) 2010 LIFT A =146,337 CY (STOCKPILE 11) + 31,593 CY (AHEAD OF PIT) = 177,930 CY (100% recovery) <br />ZONE 2 -7.84 ACRES x 43560 SF /ACRE x 211N/121N/FT = 22,135 CY OF MIXED TOPSOIL <br />LIFT A VOLUME (AHEAD OF PIT) <br />#19 9 44 27 CF /CY <br />#20 9 39 29.11AC x 43680 SF /ACRE x 91N/121N x 93% RECOVERY = 29,382 CY <__= Thickness from Table A <br />#21 9 52 27CF /CY ZONE 3 - 31.68 ACRES x 43560 SF /ACRE x 211N/121N1FT = 93,702 CY OF MIXED TOPSOIL <br />#22 9 52 27 CF /CY <br />2010 LIFT B = 221,516 CY (STOCKPILE 12) + 172,113 CY (AHEAD OF PIT) = 393,629 CY (100% recovery) <br />#23 9 36 <br />#24 9 53 LIFT B VOLUME (AHEAD OF PIT) <br />(26.11 AC + 1.72 AC) x 43560 SF /ACRE x 461 W121N X 93% RECOVERY =160,085 CY <__= Thickness from Table A ZONE 4 - 54.33 ACRES x 43560 SF /ACRE x 241N /121N /FT = 175,304 CY OF LIFT A TOPSOIL <br />AVG 9 46 27 CFICY 27 CF /CY <br />SUBSOIL VOLUMES REQUIRED IN EACH ZONE <br />EXISTING TOPSOIL STOCKPILES & VOLUMES AS OF MAY 2010 <br />ZONE 1 - 12.21 ACRES x43560 SF /ACRE x 331N /12IN /FT = 54,171 CY OF BENCH 1 SUBSTITUTE SUBSOIL <br />NOTE, OUTLINE OF EACH STOCKPILE IS SHOWN ABOVE 27 CF /CY <br />ZONE 2 - 7.84 ACRES x 43560 SF /ACRE x 331N/121N/FT - 34,783CY OF BENCH 1 SUBSTITUTE SUBSOIL <br />27 CF /CY <br />0 8, 050 cy <br />Mixed Topsoil, ZONE 3 - 31.68 ACRES x 43560 SF /ACRE x 331N /121N /FT = 140,554 CY OF LIFT B TOPSOIL <br />27 CF /CY <br />ZONE 4 - 54.33 ACRES x 43560 SF /ACRE x 331N /121N /FT = 241,044 CY OF LIFT B TOPSOIL <br />146,337 cy <br />2221cy <br />27 CF /CY <br />Lift A Topsoil <br />Legend <br />221,516 cy 124, Permit Boundary <br />Lift B Topsoil Mixed Topsoil <br />MORGAN TOPSOIL STOCK PILE TOTALS (CY) Disturbance Boundary <br />124,221 MIXED Notes 8,050 MIXED Pre-mine Contours <br />132,271 MIXED 1) For topsoil balance calculations, see narrative in section 2.05.4(2)(d) Subsection 12.1.1 5820 <br />2) From May 2010 to the end of the mine life, all Bench 1 material excavated from the Morgan <br />146,337 LIFTA TOPSOIL property will be replaced on the Morgan property. <br />221,516 LIFT 8 TOPSOIL 3) Following the replacement of topsoil from a stockpile, the stockpile footprint will be ripped, Post -mine Contours <br />AS OF APRIL 27, 2010 scarified, and further prepared according to Section 2.05.4(2)(d) Subsection 13.1 prior to <br />topsoil replacement on said stockpile footprint. <br />MAP 2,05,4 -6 & 7 MORGAN TOPSOIL REPLACEMENT 05AUGIO.dw <br />