My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REVISION - C1981008 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-08-10_REVISION - C1981008 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:43 PM
Creation date
8/18/2010 5:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
8/10/2010
Doc Name
Response 4 Revised Section 2.05.4(2)(d)
From
Western Fuels-Colorado
To
DRMS
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.2 Reclaimed Irrigated Pastureland Topsoil Preparation Procedures <br />Topsoil replacement operations may be carried out during most of the year, the exception being <br />those periods when wet conditions would preclude handling of the topsoil materials. <br />1- Ripping - Prior to replacement of the single lift topsoil, the graded Bench 1 Surface Spoil will <br />be ripped to reduce compaction. This will be done to a depth of 2 feet. This will be done by <br />dozer with rippers or a chisel plow. <br />2 - Land leveling - WFC uses a blade of 10' to 14' width pulled behind a farm tractor to level the <br />topsoil surface and allow a smoother surface for seeding. <br />3 -Rock picking - WFC will use a mechanical device pulled behind a tractor that rakes up large <br />rocks over approximately 2.5 inches in diameter. Rocks up to approximately 24" diameter can <br />be picked up by the device. The rocks are removed from the field. Sandstone lenses that are <br />identified in any topsoil or subsoil will be buried in lower bench 1 overburden replacement, well <br />below any rooting depth in the reclamation area. <br />4 - Fertility testing - This test is conducted within 3 months of topsoil placement. Three soil <br />samples will be obtained from the top 2 feet of soil in the field to be tested. The field is basically <br />defined as that area that has recently been topsoiled. Samples will be taken and analyzed by a <br />lab using the standard soil test for pH, salts, organic matter, nitrogen, potassium, and <br />phosphorous. The lab will be informed that the desired crop is irrigated pasture grass /alfalfa mix <br />and that the desired 1 st cut production is 1.75 tons per acre. <br />5 - Disking - Prior to final seedbed preparation, soil conditioning and weed control tillage will be <br />carried out through disking. Disking will relieve any topsoil compaction, will aid in controlling <br />weedy species, and will leave the site in a temporary roughened condition reducing wind and <br />water erosion potential. Disking will be used to condition soil, break up clods, and control <br />weeds through tillage prior to seeding. If annual weeds are a problem, several tillage <br />operations may be required to get adequate control. <br />Revised PR 06 June 10 2.05.4(2)(d) -42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.