Laserfiche WebLink
SEDCAD 4 for Windows <br />rrvwrinlht i0 -9nM P.m a 1 crn..,a,. <br />Dead Space: <br />*No sediment capacity defined <br />Perforated Riser <br />9 <br />Riser <br />Diameter Riser Height <br />Barrel <br />Diameter Barrel Barrel Sbpe <br />Number of <br />Manning's n Spillway Elev Holes per <br />(in) (ft) <br />I (in) Length (ft) (°Ya) <br />I (ft) El. <br />12.00 10.001 <br />12.00 100.00 1.181 <br />0.0150 5,615.50 1 <br />Straight Pipe <br />Barrel <br />Barrel <br />Entrance <br />Entrance Tailwater <br />H'graph Deten Time: <br />-- — - - Pond <br />Barrel Manning's <br />Barrel Manning's <br />Spillway <br />Diameter <br />Length <br />Loss <br />Loss Depth <br />Dewater Time: <br />- --- - - -- - <br />Slope ( %) n <br />Slope ( %) n <br />Elev (ft) <br />(in) <br />(ft) <br />Coefficient <br />Coefficient (ft) <br />18.00 <br />40.00 <br />1.001 0.0150 <br />5,616.00 1 0.50 0.00 <br />Straight Pipe <br />Barrel Barrel 1 Entrance Tailwater <br />Barrel Manning's Spillway <br />Diameter Length Slope (%) n Elev (ft) LOSS Depth <br />(in) (ft) Coefficient (ft) <br />18.00 40.00 1.001 0.0150 5,616.00'i 0.50 0.00 <br />Straight Pige <br />Barrel <br />Barrel <br />Entrance <br />Tallwater <br />H'graph Deten Time: <br />-- — - - Pond <br />Barrel Manning's <br />Spillway <br />Diameter <br />Length <br />Loss <br />Depth <br />Dewater Time: <br />- --- - - -- - <br />Slope ( %) n <br />Elev (ft) <br />(in) <br />(ft) <br />Coefficient <br />(ft) <br />18.00 <br />40.00 1.00 0.0150 <br />5,616.00 1 0.50 <br />0.00 <br />Pond Results: <br />Dewatering time is calculated hvm peak stage to lowest spillway <br />Elevation - Capacity - Discharge Table <br />Filename: 011 POND 25YR post mine Iday pump 15sept09.sc4 <br />Printed 09-16 -2009 <br />REVISED AUGUST 2009 Attachment 2.05.3(3) -22 -31 <br />Peak Elevation: 5,616.57 ft <br />H'graph Deten Time: <br />-- — - - Pond <br />10.82 hrs <br />Model: <br />CSTRS <br />Dewater Time: <br />- --- - - -- - <br />3.32 days <br />-... ---_-------------- <br />------------------- ------------------------- --- ---- -- <br />Trap Efficicy <br />en: <br />93.29 % <br />Dewatering time is calculated hvm peak stage to lowest spillway <br />Elevation - Capacity - Discharge Table <br />Filename: 011 POND 25YR post mine Iday pump 15sept09.sc4 <br />Printed 09-16 -2009 <br />REVISED AUGUST 2009 Attachment 2.05.3(3) -22 -31 <br />