Laserfiche WebLink
already been backfilled with a minimum of 30 inches of this material. The Lloyd property will receive <br />a minimum of 30" of this material and the WFC property will receive a minimum thickness of 24" <br />of this Bench 1 material. For the purposes of the volume calculations, the suitable subsoil material <br />on the Benson West is assumed to be 30" in thickness, and Lloyd property is 30" and the WFC <br />property will be 24" in thickness. These amounts allow a minimum of 48" total suitable medium on <br />the Benson and Lloyd properties and 44" on the WFC property. <br />From the 1998 soil survey, the Bench 1 suitable material is differentiated from the bottom of Lift <br />B (which is the C soil horizon) by greater percentage of coarse fragments. <br />(Revised July 2010) 2.04.9 -38 <br />