Laserfiche WebLink
012. <br />13 <br />Primary future Post-minin land use check one : <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) _E1 Forestry(FR) <br />0 Residential(RS) F? Recreation(RC) <br />ID Developed Water Resources(WR) <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) t Forestry(FR) <br />Residential(RS) _0 Recreation(RC) <br />Developed Water Resources(WR) <br />-4- <br />F? General Agriculture(GA) <br /> Wildlife Habitat(WL) <br />_ Industrial/Commercial(IC) <br /> Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />II Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Materials will be mined using front end loaders, trucks, conveyors and scrapers. <br />15. On Site Processing: • Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavate with front end loader and convey material to a processing plant then crush and wash excavated materials. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />See attached Chemical Inventory List <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />