My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-18_PERMIT FILE - M2010058 (13)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010058
>
2010-08-18_PERMIT FILE - M2010058 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:19:19 PM
Creation date
8/18/2010 3:32:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010058
IBM Index Class Name
PERMIT FILE
Doc Date
8/18/2010
Doc Name
112 Operation Reclamation Permit App and supporting docs (Cerise Mine)
From
Lafarge West, Inc
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relocated access lanes will be constructed with 6" of native sand and gravel from the floor of the <br />mine and remain in place once mining and reclamation are complete. <br />The main access to the site will be off of Crystal Springs Road on the western side of the property. <br />This will require crossing Crystal Creek. Therefore, a small section of the Creek where the road <br />will cross will be piped and fill from the mining site will be used to build the access road from <br />Crystal Springs Road over to the mining site. <br />Mine Schedule <br />Lafarge anticipates mining and reclaiming the site in approximately 15 years. The table below <br />outlines the anticipated mine schedule by phase. As previously stated, this schedule is just an <br />estimate due to the fact that the rate of mining and overall life of the mine is dependent upon <br />demand and market conditions. <br />Phase Mine Area (in acres) Projected Time to Mine (in years) <br />1 11.5 1.9 <br />2 24.1 7.1 <br />3 7.4 2.0 <br />4A 8.1 3.4 <br />4B 2.1 0.6 <br />TOTALS 51.1 15.0 <br />Phase Overview <br />Initially mining will begin by excavating the aggregate from Phase 1 to create a tailings pond which <br />will stay in place for the life of the mine. This tailings pond is needed before any aggregate can be <br />processed; therefore, the aggregate from Phase 1 will be stockpiled on site until all of Phase 1 is <br />excavated. The aggregate processing plant will be set-up, in the area that will be mined as Phase 3, <br />and the aggregate from Phase 1 will then be processed. In addition, the rest of the plant site <br />structures, including the concrete plant, will be constructed west of the aggregate processing plant. <br />A location for a temporary asphalt plant is also proposed for this plant site area. A portable asphalt <br />plant will be place on-site if there is a construction project in the area that requires asphalt. Mining <br />on Phase 2 will begin after the Phase 1 is processed. Phase 2 will be mined in 25' lifts down to an <br />elevation approximately 2' above the water table. Once Phase 2 is mined, the aggregate processing <br />plant and proposed location for the temporary asphalt plant will move to the floor of the Phase 2 pit <br />and (all of the other permanent plant site improvements will remain in place) and mining on Phase 3 <br />will begin. Phase 4A will be a primary storage place for overburden from previous phases; <br />therefore, the overburden from 4A will need to be moved into Phase 3 to be used to begin creating <br />reclamation slopes before Lafarge can begin mining Phase 4A. Upon the completion of Phase 4A <br />mining, the concrete plant and other plant site improvements will be removed from the site and <br />Phase 4B mining will begin. Following the mining of phase 4B final reclamation will begin. <br />Cerise Mine <br />DRMS 112 Reclamation Permit Application <br />Page D4 of D5
The URL can be used to link to this page
Your browser does not support the video tag.