Laserfiche WebLink
table to a level at least 500 feet below the Steve Level, and sufficient to reestablish a hydraulic <br />gradient away from Ralston Creek. Implementation must occur as soon as possible, but no later <br />than July 31, 2010." The reasons for Cotter's opposition are set forth in a "Rationale for Not <br />Conducting Mine Dewatering and Mine Water Treatment at the Schwartzwalder Mine," by <br />Susan A. Wyman, P.E., P.G., of Whetstone Associates, which was submitted to the WQCD on <br />June 25, 2010, and is incorporated herein by reference. <br />An estimated time for the hearing is five hours. <br />DATED thQq_ day of 12010. <br />Respectfully submitted, <br />Henry W. Ipsen <br />Charlotte L. Neitzel <br />HOLME ROBERTS & OWEN LLP <br />1700 Lincoln Street, Suite 4100 <br />Denver, CO 80203 <br />e-mail: hank.ipsen@hro.com <br />charlotte.netizel@hro.com <br />(303) 861-7000 (phone) <br />(303) 866-0200 (fax) <br />Attorneys for <br />Cotter Corporation (N.S.L.) <br />2 <br />#1478739 Y1 den