My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-23_HYDROLOGY - M1977300
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977300
>
2010-07-23_HYDROLOGY - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:43 PM
Creation date
8/18/2010 7:37:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
HYDROLOGY
Doc Date
7/23/2010
Doc Name
Colorado Discharge Permit
From
CDPHE-WQCD
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 13 of 22 <br />Permit No.: CO-0001244 <br />6. Shmatorv and Certification Requirements <br />a. All reports and other information required by the Division, shall be signed and certified for accuracy by the permittee in <br />accord with the following criteria: <br />i) In the case of corporations, by a responsible corporate officer. For purposes of this section, the responsible <br />corporate officer is responsible for the overall operation of the facility from which the discharge described in the <br />form originates; <br />ii) In the case of a partnership, by a general partner; <br />iii) In the case of a sole proprietorship, by the proprietor; <br />iv) In the case of a municipal, state, or other public facility, by either a principal executive officer, or ranking elected <br />official. For purposes of this section, a principal executive officer has responsibility for the overall operation of the <br />facility from which the discharge originates; <br />v) By a duly authorized representative of a person described above, only if: <br />1) The authorization is made in writing by a person described in i, ii, iii, or iv above; <br />2) The authorization specifies either an individual or a position having responsibility for the overall operation of <br />the regulated facility or activity such as the position of plant manager, operator of a well or a well field, <br />superintendent, position of equivalent responsibility, or an individual or position having overall responsibility <br />for environmental matters for the company. (A duly authorized representative may thus be either a named <br />individual or any individual occupying a named position); and, <br />3) The written authorization is submitted to the Division. <br />b. If an authorization as described in this section is no longer accurate because a different individual or position has <br />responsibility for the overall operation of the facility, a new authorization satisfying the requirements of this section must <br />be submitted to the Division prior to or together with any reports, information, or applications to be signed by an <br />authorized representative. <br />The permittee, or the duly authorized representative shall make and sign the following certification on all such <br />documents: <br />"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in <br />accordance with a system designed to assure that qualified personnel properly gather and evaluate the information <br />submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible <br />for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate and <br />complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine <br />and imprisonment for knowing violations."
The URL can be used to link to this page
Your browser does not support the video tag.