Laserfiche WebLink
-4- <br />12. Primarv future (Post-minine) land use (check one): <br />F]Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br /> General Agriculture(GA) <br /> Wildlife Habitat(WL) <br /> Industrial/Commercial(IC) <br /> Solid Waste Disposal(WD) <br />13. Primary resent land use check one i <br />0 <br />F Rangeland(RL) ! Forestry(FR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Bulldozer & Loader <br />Cropland(CR) Pastureland(PL) <br />Residential(RS) ? Recreation(RC) <br />Developed Water Resources(WR) <br />15. On Site Processing: _D Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Expanding approximately 3.7 acres on the East side to include undesignated roads; Starting on <br />the SW corner of the existing pit going to the West 427 ft. then turning North travel 449 ft. then <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />EJ Industrial/Commercial(IC) <br />angling off to NE approximately 700 ft to the west boundary of existing pit.