My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-12_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2010-08-12_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:50 PM
Creation date
8/17/2010 7:48:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
8/12/2010
Doc Name
July 2010 Monthly Report
From
Battle Mountain Resources, Inc.
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br /> <br />August 10, 2010 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />AUG 12 2010 <br />Divisian a :r ?a;ion, <br />k9ning erd Safatj <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />July 2010 Monthly Report <br />Dear Mr. Sorensen: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br />San Luis Project for the month of July, 2010. <br />Surface and ground water monitoring and analysis were completed for all required sites during the month <br />per the terms and conditions of the TR-32 Quality Assurance and Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on July 29th, no water was present for sampling and <br />subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br />Pit monitoring wells on July 29th. July tailing impoundment piezometer measurements identified these <br />installations were either dry or contained less than 12 inches of water as illustrated in Table 2. Tables 1 <br />and 2 below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The leak detection system was measured on July 30th. A total of 580 gallons of water was excavated from <br />the leak detection system yielding a monthly average of 20 gpad. The tailings pond under-drain measured <br />24 gpm. <br />During July the West Pit water treatment plant operated efficiently discharging a total of 7,798,600 <br />gallons (23.93 acre-feet) of water to Rito Seco Creek and a total of 1,156,200 gallons ( 3.55 acre-feet) of <br />water was transferred from the water treatment plant to the tailings impoundment. Seepage along Rito <br />Seco Creek remained dry during the month. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 • (719) 379-0798 • Fax (719) 379-0713
The URL can be used to link to this page
Your browser does not support the video tag.