Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />Subtotals :? $0.00 I $0.00 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time Non- Tot <br />l <br />t <br />l <br /> a <br />one-way <br />rave <br />distance : 15.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.33 0.33 Total non-roadable mob/demob cost $891.22 <br />Return time (hours) = 0.33 0.33 two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $0.00 <br />Unloading time (hours) = 0.50 NA one round trip, no haul rig <br />Subtotals = 1.67 0.67 <br /> <br />JOB TIME AND COST Total job time . 3.33 hours <br /> Total job cost : $891 <br />Grand Junction