Laserfiche WebLink
FORBS : sheet 2 of 2 <br />SHRUBS AND TREES (seed) : <br />Seed application method : Drill seeding {DMG survey data) TOTAL SEED APPLICATION COST/ ACRE : $85.23 <br /> <br />.. .:. . <br />MULCHING and MISCELLANEOUS <br />Materials - item no. 1 <br />item no. 2 <br />item no. 3 <br />item no. 4 <br />DESCRIPTION (data source) UNITS /ACRE UNIT COST /UNIT COST /ACRE <br />Straw, delivered {DMG survey data} 2.00 ton $110.50 $221.00 <br />Herbicide - Curtail @ 8.0 pt/ac 1.00 acre $68.40 $68.40 <br /> <br /> <br /> TOTAL MULCH MATERIALS COST/ ACRE : $289.40 <br />Application - method no. 1 : Power mulcher (MEANS 32 91 13.16 0700) $79.28 <br />method no. 2: Crimping, with tractor {DMG survey data) $62.32 <br />method no. 3: Weed spray, truck, non-aquatic area, nox. (DMG) $56.93 <br /> TOTAL MULCH APPLICATION COST /ACRE: $198.53 <br />NURSERY STOCK PLANTING TYPE and SIZE <br />COMMON NAME NO. / ACRE (planting cost data source) MATERIAL <br />COST / PLANT PLANTING <br />COST / PLANT COST / FERT. <br />PELLET TOTAL <br />COST / PLANT TOTAL <br />COST / ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST / ACRE : $0.00 <br />JOB COST No. of acres : 10.00 Cost / acre . $926.43 INITIAL JOB COST : $9,264.35 <br />Estimated failure rate (percent) : 50.00% Cost / acre': $926.43 RESEEDING JOB COST : $4,632.17 <br />Selected replanting work items : F T S M TOTAL JOB COST : $13,897 <br />• TOTAL SEEDS / SO. FT.: 42.8 ' TOTAL POUNDS PLS / ACRE : 8.90 `TOTAL SEED MIX COST I ACRE : $126.16