Laserfiche WebLink
Hiahwall Reduction <br />Assume mining at a 1H:1V slope and max. height of 80 ft and max. length up to 1,200 ft <br />Total volume of material to be moved by D8 dozer to create 3H:1V slope calculated: <br />900 ft X 1,600 ft2 = 1,440,000 ft3 X (1/27) = 53,333 yd3 <br />- - - - - - /. 7 OA Ia <br />soft <br />a -J. -- j - -