Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 01a State :Colorado Permit/job# M--2010-019 <br />Date : 0712312010 County :Archuleta Abbreviation :none <br />User : DMC Site :Eaq/e Mtn. Pit Filename :M019-01a <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $46.56 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $155.72 Total fleet cost/hour : $155.72 <br />_ <br />MATERIAL QUANTITIES .. _. _ ,. <br />Initial Swell Loose <br />volume : 53,333 LCY factor : NA volume : 53,333 LCY <br /> <br />Source of estimated volume :See attachment <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 126 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 726.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) _ <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,800 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 1.03 <br />Weight description <br />Top Soil Adjusted unit production : 749.05 LCY/hr <br /> Adjusted fleet production : 749.05 LCY/hr <br /> <br />.:::. <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 71.20 Hours <br />Unit cost : $0.208 /LCY Total job cost : $11,088 <br />