Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 42, 30K GVW $54.65 1 $54.65 $54.65 <br />-Light Duty Pickup, 44, 314 T. $30.11 1 $30.11 $30.11 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $84.76 $84.76 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Norwood <br />Transportation Cycle Time : Non- Total one-way travel distance : 5.0 miles <br /> Roadable Roadable Average travel speed : 25.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.20 0.20 Total non-roadable mob/demob cost $320.28 <br />Return time (hours) = 0.20 0.20 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $33.91 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.40 0.40 <br /> <br /> <br />JOB TIME AND COST . <br />Totai job time : <br />2,80 hours <br /> Total job cost : $354