My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-10_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/11/2010 7:29:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/10/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 07/18/2010 and 7/25/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AW% <br />ame <br />Earth & Environmental <br />AMEC observed, performed necessary testing, obtained moisture samples, and assisted in the placement <br />and moisture conditioning of SLF material within the Phase 5 VLF. <br />AMEC inspected and approved subgrade for geomembrane deployment within the Phase 5 VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC inspected and accepted the primary and secondary geomembrane within the Phase 5 VLF. <br />AMEC observed LVSCF placement within the Phase 5 VLF constantly. <br />AMEC observed DCF placement within the Phase 5 VLF constantly. <br />AMEC observed, obtained samples, and assisted in the process of SLF material at the East Cresson Clay <br />Borrow. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed and inventoried geomembrane delivered to site from Polyflex. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue processing SLF material at the East Cresson Clay Borrow. <br />Continue processing DCF material at the Drain Cover Fill process area. <br />Continue subgrade preparation for SLF placement. <br />Continue SLF placement within the Phase 5 VLF footprint. <br />Continue geomembrane installation within the Phase 5 VLF footprint. <br />Continue high and low volume collection systems. <br />Continue LVSCF placement. <br />Continue DCF placement. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Weekly Construction meeting on July 27, 2010. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />VLF Weekly Report WE 07.31.10.D
The URL can be used to link to this page
Your browser does not support the video tag.