Laserfiche WebLink
ame <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: July 31, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />'UG' 10.9n. <br />Reporting Period: 7/25/10 through 7/31/10 <br />Days S M T WI T F S <br />Work Shifts - D D D D D D <br /> <br />D = Day Shift N = Night Shift <br />Oivislpn <br />Mining & Safe ation, <br />Ambient Temperature Range (F): Low: 50°F to 56°F (+/-) High: 66°F to 78°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Afternoon rain showers delayed work activities during the week. Due to heavy rainfall, <br />erosion of the Phase 5 VLF east slope was observed. Sediment reported to the bottom of the Phase <br />5 PSSA. Ames began remediation and installing temporary erosion controls. <br />AMEC was informed by Ames that nightshift would resume Monday, 8/2/2010. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />Fine grading, moisture conditioning, and compaction of subgrade was performed prior to soil <br />liner fill (SLF) placement during the week. The areas inspected and approved for placement <br />are shown on Figure 1. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations G28+50 (+/-) and G30+00 (+/-), <br />approximately 150 to 175 feet left of centerline and between stations H0+50 (+/-) and H7+50 <br />(+/-), approximately 0 to 150 feet right of centerline. Slope contouring was performed using <br />various CAT dozers and various CAT excavators. The material generated as the cut progressed <br />was pushed down the slope. <br />VLF Weekly Report WE 07.31.10.1)