Laserfiche WebLink
O <br />O <br />co <br />O <br />O° <br />00 <br />O? <br />O° <br />Ox <br />Dry / <br />1 <br />O <br />N <br />O <br />0 <br />o cu <br />l <br />0 <br />0 <br />o <br />o w <br />co <br />N <br />0 <br />O <br />O <br />O 00 <br />O W <br />+ <br />00 <br />N <br />O <br />O <br />O <br />G32+00 XOO { <br />O ° <br />_ nn p2+O? D4+ <br />r ---,? <br />O <br />O <br />10 <br />° <br />O <br />w <br />Ox <br />O° <br />?X <br />4 <br />o° <br />co <br />r <br />0 <br />0 <br />aT <br />O <br />O <br />+ <br />N <br />S <br />$i LEGEND: <br />o° <br />-7? EXISTING GROUND SURFACE CONTOUR AND 0. FEET <br />PROPOSED GROUND SURFACE CONTOUR E4 FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />- PREVIOUSLY DEPLOYED LINER <br />DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 240,180 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 18,488 SQUARE FEET OF SECONDARY 100 MIL GEOMEMBRANE <br />x DEPLOYED DURING WEEK <br />a'?° APPROXIMATELY 1,892,495 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />O° <br />ij - GOLD MINING COMPANY <br />--- PROJEcr <br />PHASE 5 VLF <br />TIM <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA 100 MIL SECONDARY <br />DESIGNED BY CMT CHECKED BY JON DATE <br />affmc DRAWN 8Y CUT APPROVED BY JOI 07/31/10 <br />EARTH AND. ENVIRONMENTAL __. _ cAOO cRtRANE I rRI a ft aw <br />3b 0