My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-05_INSPECTION - M1977546
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977546
>
2010-08-05_INSPECTION - M1977546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:33 PM
Creation date
8/10/2010 1:51:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977546
IBM Index Class Name
INSPECTION
Doc Date
8/5/2010
Doc Name
INSPECTION REPORT
From
DRMS
To
Brice F Lee & Phyllis J Lee
Inspection Date
8/4/2010
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br /> Subtotals :1 $0.00 $0.00 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest m ajor city or town within project area region : Durango <br />Transportation Cycle Time : Non- Total one-way travel distance : 20.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.44 0.44 Total non-roadable mob/demob cost $578.58 <br />Return time (hours) = 0.44 0.44 ' two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost "" : $0.00 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.89 0.89 <br /> <br /> <br />JOB TIME AND COST . >: <br />Total job time : <br />3.78 hours <br /> Total job cost : $579
The URL can be used to link to this page
Your browser does not support the video tag.