My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-05_INSPECTION - M1977546
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977546
>
2010-08-05_INSPECTION - M1977546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:33 PM
Creation date
8/10/2010 1:51:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977546
IBM Index Class Name
INSPECTION
Doc Date
8/5/2010
Doc Name
INSPECTION REPORT
From
DRMS
To
Brice F Lee & Phyllis J Lee
Inspection Date
8/4/2010
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 05-Aug-2010 Permit or job no. M-1977-546 Site :Horvath Pit No. 1 <br />User : DMC Abbreviation : none State :Colorado <br />Filename : M546-000 County: La Plata <br />Agency or organization name: DRMS <br />Permit or job action 110c SDG <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Final Grading dozer 1 1.0 $159 <br />03a -Mobilize final grading equipment mobilize 1 3.7 $579 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 4.8 $738 <br />` includes inflation factor adjustment of : NA % TOTAL DIRECT COST $738 <br />INDIRECT COSTS <br />OVERHEAD AND PROFl7 - Liability insurance : 2.02 % of direct total = $15 <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA* NA NA total = <br />Profit : 10.00 % of direct total = <br />SR <br />IVA <br />$74 <br />" not required (or eqp. operator serves as super.) TOTAL O & P = $96 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $834 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $42 <br />CONTINGENCY - NA* NA total = NA <br />contingencies accounted for at task level TOTAL INDIRECT COST = $638 <br />TOTAL BOND AMOUNT (direct + indirect) _ $1,376
The URL can be used to link to this page
Your browser does not support the video tag.