My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-05_REVISION - M1983158
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983158
>
2010-08-05_REVISION - M1983158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:45:27 AM
Creation date
8/10/2010 1:50:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983158
IBM Index Class Name
REVISION
Doc Date
8/5/2010
Doc Name
Cadgene Pit, Surety Increase Notice
From
DRMS
To
MJ Cadgene
Type & Sequence
SI3
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $1.59 25 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $164.49 Total fleet cost/hour : $164.49 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,445 LCY factor : NA volume : 5,445 LCY <br /> <br />Source of estimated volume: accepted volumes _ <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.07 (Cat HB) <br />Average push gradient : 3.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,280 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.53 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 335.09 LCY/hr <br /> Adjusted fleet production : 335.09 LCY/hr <br /> <br /> <br />... <br />............. <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 16.25 Hours <br />Unit cost : $0.491 /LCY Total job cost : $2,673 <br />
The URL can be used to link to this page
Your browser does not support the video tag.