Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />.... . ................ <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION <br />FORM <br />USED <br />FLEET <br />SIZE ... <br />TASK <br />HOURS .... _ .. . <br />DIRECT <br />COST <br />01a -Reduce highwalls to 3:1 slope dozer 1 3.3 $553 <br />02a -rip pit floor for topsoil prep ripper 1 15.4 $2,601 <br />03a -topsoil 9 acres of disturbance dozer 1 16.2 $2,673 <br />04a -reveg of 9 acres disturbance (includes secondary seeding) revege 1 32.0 $10,888 <br />05a -initial mobilization to site mobilize 3 3.04 $860 <br />06a -secondary reclamation mobilization mobilize 2 3.04 $361 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 73.11 $17,936 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST * = $17,936 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02. % of direct total = $362 <br />Performance bond : 1.05 % of direct total = $188 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $1,794 <br />. not required (or eqp. operator serves as super.) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTRACT AMOUNT (direct + O & P) _ <br />total $ NA total = <br />_NA NA total = <br />% of cntr. NA total = <br />CONTINGENCY - <br />TOTAL O & P = $2.344 <br />0.00 <br />NA <br />5.00 <br />NA* <br />NA <br />total = <br />* contingencies accounted for at task level <br />TOTAL INDIRECT COST = <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$20,280 <br />$0 <br />NA <br />$1,014 <br />NA <br />$3,358 <br />$21,294