My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-06_GENERAL DOCUMENTS - M2009079
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2009079
>
2010-08-06_GENERAL DOCUMENTS - M2009079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:35 PM
Creation date
8/10/2010 1:50:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009079
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
8/6/2010
Doc Name
SALE OF MINERAL MATERIALS
From
BLM
To
Precision Excavating
Email Name
GRM
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z 0 <br />e <br />11?. A 4 ft. berm will be maintained around the mining activity from April 1- July 1 to protect nesting sage grouse. <br />12. A maximum of 35 acres of disturbance will be allowed at one time. <br />13. Warning signs shall be placed where appropriate during operational phases to minimize hazards to passing traffic. <br />14. Between operations, the pit walls shall be maintained at a slope ratio not to exceed 3H:1 V, so as to minimize slope failure <br />potential and public safety hazards. <br />15. Production figures and weigh tickets will be submitted monthly. <br />16. A map showing the areas of operations and annual production of tons of material removed will be submitted annually by <br />February 1. <br />17. To eliminate disturbance of existing power, telephone, and road rights-of-way, there will be no excavation within 40 feet of <br />power poles, telephone poles, pole anchors, or the nearest side of an existing road. <br />18. BLM inspectors will be allowed access to the site. <br />19. When the pit has been exhausted, the items in l.b. above shall be completed. <br />20. The reclamation bond for the Precision Excavating Peroulis Brothers Snake River Pit will not be released until BLM has <br />determined that Precision Excavating has fulfilled its reclamation obligations. If the damages exceed the amount of the bond, <br />Precision Excavating is liable for the excess. <br />OM - 1? -- <br />Signature <br />-7//? 10 <br />Date <br /> <br /> <br />-a <br />
The URL can be used to link to this page
Your browser does not support the video tag.