Laserfiche WebLink
July 19,2010 C-1981-019/Colowyo Coal Mine JRS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> R -Air Resource Protection R -Roads <br /> N -Availability of Records R -Reclamation Success <br /> R -Backfill&Grading Y -Revegetation <br /> R -Excess Spoil and Dev.Waste NA -Subsidence <br /> N -Explosives NA -Slides and Other Damage <br /> Y -Fish&Wildlife R -Support Facilities On-site <br /> R -Hydrologic Balance Y -Signs and Markers <br /> R -Gen. Compliance With Mine Plan NA -Support Facilities Not On-site <br /> R -Other NA -Special Categories Of Mining <br /> NA -Processing Waste R -Topsoil <br /> COMMENTS <br /> This was a complete inspection of the Colowyo Mine conducted by Jim Stark of the Colorado Division of <br /> Reclamation,Mining and Safety. The inspection was conducted on 19-22 July 2010. Ryan Pawlowski and <br /> Jennifer Sekulski of Colowyo accompanied me on different portions of the inspection. The weather was warm and <br /> sunny during most of the inspection and the ground was mostly dry. Colowyo did receive rain on the night of 21 <br /> July 2010 but that did not create and problems getting around. <br /> AIR RESOURCE PROTECTION—Rule 4.17: <br /> -The South Taylor Haul Road and the haul roads in the West Pit and South Taylor Pit were creating some dust but <br /> Colowyo was actively watering the roads at the time of the inspection. <br /> -Colowyo has applied magnesium chloride to several of the haul roads in the West Pit area to help control dust. <br /> BACKFILL and GRADING—Rule 4.14 <br /> Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2;Highwall Elimination <br /> 4.14.1(2)(f); Steep Slopes 4.14.2,4.27; Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and <br /> Gullies 4.14.6: <br /> -Colowyo has not completed any additional backfilling and grading at the site since the spring of 2010(around <br /> March 2010). <br /> -Colowyo has completed approximately 90 acres of backfilling and grading in the West Pit. In addition to this 90 <br /> acres there is also a block of approximately 35.6 acres that were backfilled and regraded in 2007 and 4.4 acres that <br /> were backfilled and regraded in 2009 that did not have the topsoil replaced. These areas will have the topsoil <br /> replaced and they will be reseeded this year as well. The total acreage in the West Pit that will be topsoiled and <br /> reseeded in 2010 is approximately 130 acres. To date Colowyo has completed approximately 145.7 acres of <br /> backfilling and grading in the West Pit. In the approved backfilling and grading plan(Map 29)Colowyo has <br /> committed to complete 675.8 acres of backfilling and grading by the end of 2012. Based on the amount of <br /> backfilling and grading that has been completed to date, Colowyo will need to complete approximately 530.1 acres <br /> of backfilling and grading in the West Pit in 2011 and 2012. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 2 of 13 <br />