Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 253 <br />Date : 0810512010 <br />User : JRS <br />Permit/job# :C-1981-038 <br />Abbreviation :none <br />Filename : C038-253 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And <br />Permit or other job action :Permit Revision 04 <br />Task description : Regrade Light-Use Roads - Credit <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 40_5_ <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> <br />Utilization % _ <br />Cost Breakdown : Ownership cost/hour : $67.77 NA <br />Operating cost/hour : $95.29 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $201.60 Total fleet cost/hour : $201.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,000 BCY factor : 1.250 volume : 7,500 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition i <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 5.00 % (1 <br />Average site altitude : 8,100 feet <br />Material weight : 2650 Ibs/LCY <br />Weight description : <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility: <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type <br />Net correction <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time <br />Unit cost : $0.663 /LCY Total job cost <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Delta <br />Site :Bowie No. 1 Mine <br />Source <br />0.75 (avg.) <br />0.90 (Cat HB) <br />1.00 (gen.)_ <br />1.00 (avg.) <br />0.83 (1 shift/day) <br />0.80 (fnd-rt) <br />0.90 (Cat HB) <br />0.95 (Cat HB) <br />0.87 (Cat HB) <br />1.00 (S/SU/U) <br />0.33 <br />303.92 LCY/hr <br />303.92 LCY/hr <br />24.68 Hours <br />$4,975