My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-05_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2010-08-05_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:33 PM
Creation date
8/9/2010 1:40:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
8/5/2010
Doc Name
Letter & Cost Estimate (Memo)
From
Jim Stark
To
Joe Dudash
Type & Sequence
PR4
Email Name
JJD
SB1
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine C-1981-038 <br />Parmit Pavicinn OA <br />PROJECT IDENTIFICATION <br />Date : 05-Aug-10 Permit C-1981-038 Site: Bowie No. 1 Mine <br />User: JRS State : Colorado <br /> Filename: C038-250 County: Delta <br />Agency Name: Colorado Division Of Reclamation, Mining and Safety <br />Permit Action: Permit Revision 04 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />251 Plug and Seal Exploration Holes BRL-1-03-01, BRL-1-08-01 and BRL-1-08-04 42.00 -$19,016 <br />252 Regrade Three Drill Pads -5.80 -$1,169 <br />253 Regrade Light-Use Roads -24.68 -$4,975 <br />254 Replace Topsoil from Stockpile to Three Drill Pads -1.70 -$342 <br />255 Replace Topsoil from Stockpile to Light-Use Roads -11.18 -$2,255 <br />256 Reseed Three Drill Pads -1.94 -$1,494 <br />257 Reseed Light-Use Roads -7.30 -$5,623 <br /> <br /> Direct Cost Total -94.60 -$34,874 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) -$704 <br /> Performance Bond (1.05% of Direct Costs) -$366 <br /> Job Superintendent (at $52.10/hour) -47.30 -$2,464 <br /> Profit (10.00% of Direct Costs) -$3,487 <br /> Total Overhead and Profit -$7,022 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) -$41,896 <br /> <br /> Le pal l - Engineering - Project Mangaement <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) -$1,781 <br /> Reclamation Management and Administration (3.25% of Contract) -$1,362 <br /> <br /> <br /> <br /> <br /> TOTAL PR-04 LIABILITY AMOUNT - CREDIT -$45,039 <br />jrs Page 1 06-08-10
The URL can be used to link to this page
Your browser does not support the video tag.