Laserfiche WebLink
2. <br />Effects of runoff from r+eclaitned areas on the quality of streamflow: Due to the <br />relatively small area of disturbanm in the New Horizon 2 mining area, any <br />reductions in runoff will have only a minimal impact. on s am? °w qDecreas ntity, d <br />sediment in Calamity Draw is doh by i? ?tic{?? T <br />intient toads predicated. by SI@DCAD+pmdicate-t?iat reclamation efforts <br />conducted in the mining arena will enme that additional contribution of suspended <br />sediumt in runoff from r+mlaimed arms will not occur, Based on pas operating <br />history at the Nucta Mine, no significant trend toward higher conwntrations, if the <br />selected pamme m have been detected. Jun addition, pons di <br />and hAny u wpotential <br />monitored in accordance with NPDES discharge <br />impact will be identified. Therefore, runoff from the reclaimed arewaho uluha e <br />no significant impact over time on the quality ? accurrin the area should not be <br />As. a result. post mitring land uses which u <br />affected due to ft mine plan which has been approved- rk?ft 4 V "L <br />All pt,obable impacts have been determined to be of Aho these nature, of <br />minimal significance, or a plan has been presented v mitigate determined <br />to have some Sigtt'ificarice. As a result, mini octio affect,.,. to curmnt land uses <br />and T b ? 2.05.6(3)-1 <br />1d <br />be minimal. A. detailed report is included to <br />of the permit application, <br />W. Topsoil <br />el identified in Section 2.44.9, soil <br />A. The Division has determined that in a 15-acre <br />types from New orizon 2"s mine, the 13 horizon and portions of the onzvn s al] <br />c segrepa?e an t'ep ? as"su soi sn or eittop ??Snre sofa productivity cozl5s en1 <br />F", -mensnq W ruse, (4.06.2(3)). <br />B?. The Division has determined selected sbu al es ortbet t:r than ft ? rtl able}topsoil- <br />supplertacnt to topsoil. The resulting soil is all <br />This determination is based on physical and chemical analyses and field-site trials <br />approved by the Division (4M.2(4)(a))- <br />C. The applicant has subrnitted a plan for reclamation of excessive rills and n ? ui ? ce <br />plan is included in Section 2.05.4(2)(e)of the pernut application. <br />to be approved by the Division (4.14.6(1))- <br />1'V. Sealing of Drilled Holes and Underground Openings <br />A. The Division will require that each hale, well or °ed O'7.3j round opening be capped, <br />sealed, backfilled, or Otherwise properly managed (4-07-3). <br />19