My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-06_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-08-06_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:36 PM
Creation date
8/9/2010 11:28:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
8/6/2010
Doc Name
Preliminary Adequacy Review
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR86
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />6 August 2010 <br />Mr. Ryan Pawlowski <br />Colowyo Coal Company, LP <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />Re: Colowyo Mine C-1981-019 <br />Preliminary Adequacy Review - Technical Revision 86 <br />Dear Mr. Pawlowski: <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Colorado Division of Reclamation, Mining and Safety (the Division) has received <br />the Colowyo Coal Company, LLC's (Colowyo) submittal of Technical Revision 86 - <br />South Taylor Haul Road As-Built. The revision was submitted on 23 June 2010 <br />(received on 24 June 2010) and deemed complete on 6 July 2010. The Division has <br />reviewed the submittal and has the following preliminary adequacy questions. <br />1. On Map 25C, there are two polyp-shaped extensions shown at the north and south <br />ends of the South Taylor Haul Road. The Division assumes that these two <br />features are runaway truck ramps. No stationing or profile data has been <br />submitted for these extensions. Please provide labels, horizontal stationing and <br />centerline profiles for the polyp-shaped features illustrated on Map 25C. <br />2. The third paragraph of the Construction Report (Page P-1) states that topsoil was <br />"salvaged and stockpiled directly to the west of the haul road footprint prior to <br />commencement of haul road construction." The locations of the topsoil stockpiles <br />are not shown on Map 25C. Please revise Map 25C to identify the sizes and <br />locations various topsoil stockpiles developed prior to construction of the <br />South Taylor Haul Road. If the topsoil was placed in an existing topsoil <br />stockpile(s) please include the information on Map 25C and in the <br />construction report. <br />Map 25C provides plan and profile views of the as-built South Taylor Haul Road. <br />Included on the plan is a Typical Haul Road Cross Section. While haul road cross <br />sections are not specifically required by the Rules, the Division requests that <br />Colowyo provide a series of cross sections for the as-built South Taylor Haul <br />Road, created perpendicular to the centerline of the roadway, at 500-ft <br />intervals. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.