Laserfiche WebLink
Restoration Task Proposed Activity Justification <br /> Restore drainage configuration <br /> as outlined in restoration plan Minimize disturbance to the <br />-Chief Portal/Deadwood Gulch previously submitted in existing hydrologic balance and <br /> response to Reason to Believe to prevent off site erosion and <br /> Letter sedimentation impacts <br /> Stabilize bench, grade and seed- <br /> install culvert as outlined in Minimize disturbance to the <br />-May Day Portal No. 2/Deadwood Gulch restoration plan submitted in existing hydrologic balance and <br /> response to Reason to Believe to prevent off site erosion and <br /> Letter sedimentation impacts <br /> Grade road surface pursuant to <br /> Road Construction Work Plan <br /> previously submitted as part of <br /> Idaho Mine Adequacy <br /> Response, to allow drainage to <br /> be collected on the inside cut, <br /> install silt fences, clear culver Minimize disturbance to the <br />-Grade New access road inlet of brush and debris, install existing hydrologic balance and <br /> trash rack, install debris basin to prevent off site erosion and <br /> at culvert outlet, prepared sedimentation impacts that may <br /> affected area for seeding, occur to the down gradient <br /> remove material from the wetlands, improve road <br /> driveway entrance per County drainage, remove large rocks <br /> request, conduct geotechnical from road surface, where <br /> investigation of cut and fill, test possible stabilize and correct <br /> cable integrity and stability cribbing <br /> To mitigate property damage <br /> risk shown in Mr. Erickson's <br /> recent photographs, remove <br />-Muck out May Day No. 1 collapsed material in May Day <br /> No. 1 adit/portal and from the <br /> crushing and conveying Protect Wildcat Mining <br /> equipment Corporation capital equipment <br /> Interim measures to prevent <br /> <br />-Remove stored ore from May Day No. 1 movement of fine grained <br /> <br />and move off site for processing material from the pile during <br /> Material has been stored for 6 the permitting preparation and <br /> months review process <br /> Prepare roof-stabilize with <br />-Stabilize portals per MSHA timbers or suitable material to <br />requirements including May Day No. 1 strengthen entry-as necessary <br />and 2 and Chief use shotcreke to stabilize and Protect Wildcat Mining <br /> strengthen entry Corporation capital equipment <br /> Stabilize affected area to <br />-Seed areas-approved by the DRMS prevent offsite erosion and Minimize disturbance to the <br /> sedimentation existing hydrologic balance <br />-Install interim erosion and <br />sedimentation control structures per Prepare affected for seeding as Minimize disturbance to the <br />DRMS approved plan approved by DRMS existing hydrologic balance <br />Restoration Page 1