Laserfiche WebLink
6 (Form 2- Public) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Them- is no opsoi on a site- a ma eria on si a is a roc rom a cu or rom the <br />dump of the lev -I above the portcal. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />o ri o es are projec a or a area o is <br />Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />e is ur a area m e new po a wi e a perm anen structure in order o aci i a e any <br />Ar as afr t a b?( hand samp_fii_n_g ill be filled in ???ith and work Note that a typical gamole <br />location for hand sampling will be similar in size to a post hole, approximately 1-1.5 feet in <br />diameter an 1-3 tt deep. a sample will be spit on site wit approximate y t ree quarters <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: