My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-05_PERMIT FILE - P2010020 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010020
>
2010-08-05_PERMIT FILE - P2010020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:33 PM
Creation date
8/5/2010 1:51:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010020
IBM Index Class Name
PERMIT FILE
Doc Date
8/5/2010
Doc Name
New NOI Application (non-confidential)
From
Colorado Goldfields, Inc
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form 2- Public) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Them- is no opsoi on a site- a ma eria on si a is a roc rom a cu or rom the <br />dump of the lev -I above the portcal. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />o ri o es are projec a or a area o is <br />Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />e is ur a area m e new po a wi e a perm anen structure in order o aci i a e any <br />Ar as afr t a b?( hand samp_fii_n_g ill be filled in ???ith and work Note that a typical gamole <br />location for hand sampling will be similar in size to a post hole, approximately 1-1.5 feet in <br />diameter an 1-3 tt deep. a sample will be spit on site wit approximate y t ree quarters <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition:
The URL can be used to link to this page
Your browser does not support the video tag.