Laserfiche WebLink
4 (Form 2- Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds etc... <br />Remove overburden from portal structure constructed by DMG. The portal structure consists of <br />a 6 ft diameter ADS with a QFat.. ,ate. Glear and eF rep! <br />locateg at the end of the port?.l structure Ventilate underground workings to permit <br />examination, mapping , sampling and collection of approximately 5 ton bulk sample. It will be <br />necessary o c can some pa is ams ]n If i a wor mgs w ere mu as ace up a ]n <br />Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity Average Width (ft) Average Length (ft) <br />B. Drill Holes: Quantity Depth <br />C. Mud Pits: Quantity Average Width <br />Average Depth (ft) <br />(ft) Diameter (in) <br />(ft) Average Length (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits cuts, rock dumps, or other ty, es of disturbance, describe type, quantity and general dimensions: <br />Clear and or replace partially famed drainage structure ocated at the end of the portal <br />partial dams in the workings where mud has backed up behind debris. Photos of the <br />surface conditions an a portal s ruc ure area ac e . <br />D. Other Disturbances (please describe): <br />Hand sampling of waste dumps (existing) and tailings ponds. No use of equipment is <br />anticipated for this portion of the work. <br />Clean up of debris, scrap and trash On the area adjacent to the portal <br />E. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />diesel fuel and motor eil whieh ks. <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />No new roads or culvers are planned. The existing rain pipe under the road may nee <br />sci i te clean up. Exist'. ig read (ecunty) will 1-1 laintaWted-.