Laserfiche WebLink
Robinson Brick Company is filing this Annual Report providing a Notice of Intent to <br />Continue Mining Operations at Buffalo Mine located in Elbert County, Colorado. The <br />mine has a phased reclamation plan. <br />Operations (Current Year) <br />Mining operations continue in accordance with the mine plan. The permitted acreage is <br />approximately 210 acres. The maximum allowable disturbed acreage remains at 30 acres. <br />Current disturbance is approximately 8.6 acres in Phase III. No additional acres were <br />disturbed this period. No additional acres were reclaimed during this reporting period. <br />Operations (Next Year) <br />Mining operations in 2010-2011 will disturb no additional acres. <br />Bonding <br />Deemed adequate at this time.