Laserfiche WebLink
Environmental Protection Plan, Schwartzwalder Mine <br />16-1 <br />• 16. QUALITY ASSURANCE AND QUALITY CONTROL <br />Rule 6.4.20(16) requires that the EPP describe the Quality Assurance and Quality Control program and <br />measures to be employed during construction of Environmental Protection Facilities. A QA/QC program is <br />in effect for environmental monitoring at the site. A QA/QC program has been developed and approved by <br />CDPHE for the RML decommissioning activities that will take place in summer 2010. Additional QA/QC <br />protocols will developed and implemented for the selected mitigation strategies, as warranted. <br />• <br />n <br />?J <br />4109C.100731 Whetstone Associates