Laserfiche WebLink
Environmental Protection Plan, Schwartzwalder Mine 11-8 <br />The period of record extends from approximately 1973 to the present22. The data set contains dissolved and <br />total uranium and radium, as well as field parameters (temperature, pH, conductivity, and dissolved <br />oxygen.) A longer suite of parameters was analyzed approximately annually at each station. <br />In addition to the routine historical monitoring described above, an intensive water quality study was <br />conducted from 1998-1999 as part of the mine closure hydrology evaluation conducted by the Operator and <br />Adrian Brown Consultants. Water quality in Ralston Creek was measured approximately monthly at 10 <br />stations, which are listed in order from downstream to upstream in Table 11-5(b). The analytical suite <br />included constituents for which drinking water Maximum Contaminant Levels (MCLs) and Colorado <br />instream water quality standards existed at the time. <br /> Table 11-5. Surface Water Monitoring Stations <br />(a) Long-term Monitoring Stations and Non-Routine Sampling Stations in Ralston Creek <br />STATION NORTHING EASTING ' ELEVATION DESCRIPTION FREQUENCY <br />NAME <br />SW-LLHG 726,873.63 2,065,661.22 6358.0 Long Lake Head Gate Monthly <br />SW-ARH 729,590.23 2,064,210.64 6358.0 Above Red Hill Variable <br />SW-FBRG <br />.......... .................................................................... 731,700.86 <br />..... ........................................................................ 2,063,819.07 <br />..................................................................... 6460.0 <br />.......................................... .................................. First Bride <br />....................... ........................ ........ ...................................................................... Variable <br />.... ........... _..._..... <br />..... <br />... <br />.... <br />...... <br />........ <br />.... <br />. <br />.. <br />. <br />. <br />. <br />SW-BPL <br /> <br />.......... ................................................................... 732,105.23 <br /> <br />..... ....................................................................... 2,063,068.76 <br /> <br />...................................................................... 6509.0 <br /> <br />......................................... .................................. Below Property Line <br /> <br />. <br />. <br />. <br />. <br />. <br />..... <br />..... <br />.. . <br />. <br />. <br />.. <br />. <br />. <br />.. <br />. <br />. <br />.. <br />..... <br />Month <br />l <br /> <br />SW-DIS001 <br />.......... <br />733,406.0 <br />2,061,299.0 <br />: 6585.0 .. <br />. <br />....... <br />....._. <br />.. <br />... <br />....... <br />.... <br />Discharge <br />Month <br />SW-A001 <br /> <br />.......... ................................................................... 733,650.46 <br /> <br />..... ............................. -....................................... . 2,061,153.05 <br /> <br />..................................................................... 6590.57 <br /> <br />.......................................... .................................. Above Dischar e Pt A001 <br /> <br />............................ ............................................_ ................................................... <br />l <br />Month <br />..........................................Y............_.... <br />............... <br />SW-AWD 734,870.0 2,059,850.0 : 6639.9 Above Waste Dum <br />P . <br />Variable <br />............................................................................. <br />SW-Abv PI .....:....................................................................... ........................................................ <br /> <br />..................... ............................................._.._..........._.......... <br /> <br /> <br />..........._.. ............. <br />:..... .......................................................................................... <br />...._......_................. <br />Above Plant Site <br />.................................................... ._................... <br />........... ................................................................................... <br />Variable <br /> <br />.. <br />. <br /> <br />D-MENA <br /> <br />......................................................... .................... <br />735,830.0 <br /> <br />......................................................_..........._..._..._ <br />2,056,360.0 <br /> <br />............... ....... ........... ........... ........... .............. <br />6790.0 <br /> <br />_.......... .......................... ...... .................................. . <br /> <br />Downstream of Mena <br />_.............. <br />........ <br />. <br />..... <br />... <br />.. <br />. ................................... <br />.. <br />Variable <br /> <br />SHFTMENA <br />............ ................................................................. <br />735,960.0 <br />..... ........... ...................................... .............. ......_ <br />2,055,850.0 <br />............................................................. <br />6835.0 .......................................... .......... <br />. <br />. <br />. <br />. <br />... <br />......... <br />Mena Shaft <br />Variable <br />U-MENA 735,940.0 2,055,380.0 : 6815.0 Upstream of Mena Variable <br />Note: Coordinates in NAD 27. Stations listed in order from downstream to upstream. <br />(b) Local and Long-term Surface Water Monitoring Stations <br />Monitored from 1998-1999 and from June 2010 to present <br />STATION NORTHING EASTING ELEVATION ;DESCRIPTION <br />SW-LLHG <br />.................................................................... 726..873.63 <br />............................._.......................................... 2,065,661.22 <br />_..................................................................... 6155.00 <br />.................................................................... long Lake Head Gate (1.5 miles downstream) <br />......_.................................................... . <br />SW-BPL <br />.................................... _.... _........................ 732,105.23 <br />. .......................................................................... 2,063,068.76 <br />_........................... .................................... ...... 6508.97 <br />...... ........................................ ..................... !Below ProPe Line <br />...... .......... _............ __................... .....?'........................... near MW8 <br />........................................_. ( ) <br />SW-GS 732,466.73 2,062,546.19 6533.43 Guard Shack (near MW7) <br />....... ........................ <br /> <br />SW-BOS <br /> <br />............................................................... ...... . <br /> <br />732 696.77 <br /> <br />.:. .......................................................... <br /> <br />2 307.12 <br />?................062_, <br />: .................................... <br />_ <br />: 6543.60 ... <br /> <br />.................................................................... <br /> <br />........................................................................................ <br />:Below Ore Sorter <br />......................................................................................................... ....................................... <br />... <br /> <br />(near MW6).. <br />.._..__................................................................................................. <br />SW-OS 732 902.10 <br />.......................................... 2,062,102.41 <br />:...................... <br />....... <br />. <br />.. <br />. : 6551.92 Ore Sorter (u stream from Sum 3) <br />.. <br /> <br /> <br />SW-PL <br /> <br />733_,088.71 <br />............. . <br />. <br />.. <br />2,061,744.42 <br />.... <br />....................... <br />...................................................................... <br /> <br />6563.94 <br />.................................................................... <br /> <br />;Parkin Lot <br />......................................1?..............................................._............. <br />. <br />........................................................................................... <br />(near MW3A). <br />............................................................................................................_ <br />SW-BDIS <br />..................._.................. 733 336.16 <br />,..........................._............................................ 2 061..476.31 <br />.........._?................_.................................... : 6577.34 <br />.................................................................... Below Dischar e . .............. <br />......................................................................._._ ......... .................... ..................................................................................... <br /> . . <br />... <br />SW-A001 <br />................ 733,650.46 <br />.............................._ 2,061,153.05 <br />..................................................................... 6590.57 <br />................. Above Dischar a (u stream of culvert) <br />SW-UC 734,328.15 2,060,300.99 <br /> <br />......................._..........._............................. _ <br />6618.08 <br />...................._..._. <br />.. <br />. U er Culvert <br /> <br />P <br />. <br />(uPstream of culvert) <br /> <br />SW-UP <br />735,102.33 <br />2,059,153.21 . <br />. <br />_. <br />6660.82 _.. <br />.._......................................................................... <br />Upstream 01,200 ..........................................................................................._...._......... <br />' E of prop. Boundary) <br />" The surface water quality data evaluated for this report ranges from 1998 (or 1990 for uranium) to January 2009. <br />23 Elevation is approximate (within 1 ft) for station SW-130S <br />4109C.100731 Whetstone Associates