Laserfiche WebLink
Environmental Protection Plan, Schwartzwalder Mine <br />10-1 <br />• 10. SURFACE WATER CONTROL & CONTAINMENT FACILITIES <br />Major surface water control and containment facilities have been removed in accordance with the site <br />reclamation plan. Small structures for the control of surface water included berms and other best <br />management practices (BMPs) described in the current stormwater discharge permit. <br />Should the mitigation strategies under consideration in Section 15(b) of this EPP require additional surface <br />water control or containment, such facilities will be designed and constructed upon the direction of DRMS. <br />• <br />0 <br />4109C.100731 Whetstone Associates