My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-02_REVISION - M1977300 (34)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2010-08-02_REVISION - M1977300 (34)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:17 PM
Creation date
8/4/2010 8:44:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
8/2/2010
Doc Name
New Amend- EPP- Intro.
From
Cotter Corp.
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Protection Plan, Schwartzwalder Mine 1-2 <br />• Dewatering of the spiral decline ceased in September 1998, when the pumps were shut off at the bottom of <br />the decline (approximately 2,200 feet), and the lower workings of the mine were allowed to refill to the 19 <br />Level. Mining operations continued until May 2000, when the pumps were shut off on the 19 Level and 7 <br />Level, and the mine was allowed to flood. <br />(b) Mine Layout <br />The mine was accessed through the Steve Level, which occurs at approximately 6,602 feet elevation in <br />North American Datum [NADI 27 coordinates or 6,550 feet elevation in mine coordinates . Two portals <br />exist on the Steve Level, which provided for normal mine access (the Steve Portal) and emergency egress <br />(the Pierce Adit). <br />Several older workings were developed above the Steve Level. The Charlie and Minnesota levels, which <br />are 119 and 226 feet above the Steve Level, respectively, intercept the CV glory hole and represent the bulk <br />of the upper workings (Figure 1-1). Additionally, the Upper Level and LBJ Level daylight on the hillside. <br />The elevations of the upper levels are given in Table 1-1. <br />Table 1-1. Elevations of Upper Levels at the Schwartmalder Mine <br />• <br /> <br />LEVEL MINE <br />ELEVATION NAD27 <br />ELEVATION <br />Upper 6,895 6,947 <br />LBJ 6,835 6,887 <br />Minnesota 6,776 6,828 <br />CV 6,739 6,791 <br />Charlie 6,669 6,721 <br />Steve 6,550 6,602 <br />Below the Steve Level, the levels are identified according to their depth (in hundreds of feet). The most <br />extensive workings are on the 19 Level, with significant development on the 7, 9, and 15 through 17 levels. <br />The total mine depth is 2,222 feet from the Steve Level portal to the bottom of the spiral decline <br />The mine was ventilated through the Main and Jeffrey Shafts. The Main vent shaft extends from ground <br />surface at the top of the hillside (elevation 7,294 ft, NAD 27) to the 7 Level. The Jeffrey vent shaft extends <br />from ground surface near the Charlie level to the 11 Level. Areas that were not actively worked were <br />typically bulkheaded during operations, to minimize radon gas exposure. <br />During operations, the Schwartzwalder Mine was kept dry by pumping water from the lower levels of the <br />mine. Water was collected on the 19 Level, pumped to the 7 level, and then pumped to the surface where it <br />was treated and discharged to Ralston Creek. The water treatment plant also processed water from four <br />sumps in the alluvium and fill. Combined pumping from the sumps averaged approximately 100 gpm, with <br />seasonal lows of 35 gpm and highs of 400 gpm (Section 8(b)(i).3). <br />4109C.100731 <br />Whetstone Associates 6
The URL can be used to link to this page
Your browser does not support the video tag.