My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-03_REVISION - M2000158
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000158
>
2010-08-03_REVISION - M2000158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:17 PM
Creation date
8/4/2010 8:43:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
REVISION
Doc Date
8/3/2010
Doc Name
Adequacy Review #3
From
DRMS
To
Civil Resources, LLC
Type & Sequence
AM2
Email Name
JLE
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Warranty Estimate forAM02 <br />Task description : Ripping the plant area <br />................................................................................. <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Selected estimating method : Area <br />Area : 25.00 acres <br />Load factor : NA Bank volume <br />Rip depth (ft) : 1.00 Volume <br />Source of estimated quantity :Annual Report Map 2008 <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic: Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />NA feet/second <br />NA cu. yds./hour <br />1.00 feet/pass <br />7.67 feet/pass <br />500.00 feet/pass <br />88.00 feet/minute <br />0.25 minutes/pass <br />0.891 acres/hour <br />1,436.70 cu. yds./hour <br />Unadjusted production <br />per selected method : 1,436.70 cu. yds./hour <br />Site altitude : 4,770 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production <br />Adjusted fleet production <br />1,192.46 <br />4,769.83 <br />cu. yds./hour <br />cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 8.46 hours <br />Unit cost : $0.180 per cu. yd. Total job cost : $7,255 <br />NA <br />40,333 <br />BCY <br />BCY or CCY
The URL can be used to link to this page
Your browser does not support the video tag.