Laserfiche WebLink
:...... :.;:.::................................................. . <br />_ .:::: <br />::: <br />.;::::::::: <br />.. . <br />RnAnARI F FOHIPMFNT ........_........................................::.:aheet 2 of 2:. <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 10,000 Gal. $177.92 2 $355.84 $355.84 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $355.84 $355.84 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Platteville <br />Transportation Cycle Time : Non- Total one-way travel distance : 5.0 miles <br /> Roadable Roadable Average travel speed : 50.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.10 0.10 Total non-roadable mob/demob cost $27,475.28 <br />Return time (hours) = 0.10 0.10 'two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $71.17 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.70 0.20 <br /> <br /> <br />........................................................... <br />JOB TIME AND COST <br />.......................... <br />................................. <br />............................................................................................. <br />Total job time : :::....... <br />.......... <br />3.40 hours <br /> Total job cost : $27,546