59. Please add permit text discussion at the bottom ofpage 2.05-142 regarding the subsidence <br />consequences and mitigation to any loss of surface water flow in Stevens Gulch. <br />This issue is resolved. Revised page 2.05-142 was submitted in the June 1, 2010 submittal. <br />60. The second paragraph on page 2.05-143 seems to be internally contradictory: "The sandstone ledge <br />thatforms Dove Cave could collapse. However the sandstone ledge will not be damaged since it is <br />not within the area to be affected by mining. " (Emphasis added) Please verify that the text reads as it <br />is intended to read, or change as appropriate. <br />This issue is resolved. The June 1, 2010 submittal contained revised page 2.05-143. <br />61. The 3rd paragraph on page 2.05-151 refers to a limited extraction zone that has been established <br />where the I West Mains cross under Terror Creek and the WAPA transmission line. The following <br />paragraph reiterates the WAPA zone. Maps 14-B and 27 do not appear to have been modified to <br />illustrate the limited extraction zones described. Please revise Maps 14-B and 27 to depict the limited <br />extraction zones for the 1 West Mains. <br />This issue is resolved. Maps 14-B and 27 were revised accordingly in the June 1, 2010 submittal. <br />62. According to subsection 2.05.6(6)(c)(i) on page 2.05-144, the subsidence monitoring program for the <br />Bruce Park dam and Bruce Park landslide will be suspended. Text regarding the monitoring program <br />has also been struck through on page 2.05-149. However, page 2.05-158 appears to retain language <br />regarding monitoring of the Bruce Park landslide. Please review the various monitoring plans for the <br />Bruce Park Dam and Landslide and verb that the permit text is internally consistent regarding the <br />monitoring efforts proposed. <br />This issue is resolved. The strike out text was deleted on revised pages 2.05-144, 2.05-146, 2.05-149, <br />2.05-157 and 2.05-158 of the submittal dated July 8, 2010. <br />63. Because BRL is no longer proposing to mine within one mile of the Bruce Park Dam and Terror Creek <br />Reservoir, no material damage due to the Bruce Park landslide is anticipated. Therefore, the Division <br />requests that Section 2.05.6(6)(b)(iii) on revised page 2.05-143 be revised to reflect this change. The <br />Division also requests that a statement be made in this same section that, should mining be proposed <br />within one mile of the Bruce Park Dam and Terror Creek Reservoir, the subsidence control plan will <br />be reactivated. The same reference should also be added to the appropriate sections of 2.05.6(6) <br />which now discuss the subsidence control plan, rather than deleting such text. If BRL wants to <br />continue monitoring of the Bruce Park Dam and the Terror Creek Reservoir on a voluntary basis, an <br />appropriate explanation should be placed into the text as well, such as on revised page 2.05-158. <br />This issue is resolved. The requested revisions were made on revised pages 2.05-43 and 2.05-44 in the <br />June 1, 2010 submittal. <br />Section 2.10 Maps and Plans <br />64. Please revise the currently approved Maps 11, 14 and 27-B to show that the new permit boundary <br />extends to the west. <br />This issue is resolved. The three maps were revised in the June 1, 2010 submittal. <br />13