Laserfiche WebLink
further compliance issues. Coaly material from the two locations where the wash plant thickener <br />underflow pipeline leaked must be removed. Material is very close to Foidel Creek and should be <br />cleaned up to avoid any off-site impacts to the stream. The loose baffle in the Fish Creek Water <br />Treatment Facility needs to be anchored to avoid short-circuiting of the pond. <br />Please contact Christine Belka, Environmental Protection Specialist, at 303-293-5020 or <br />cbelka(aD,osmre.gov with any questions regarding this report. <br />Photographs taken: <br />Figure 1: Rock drain material for RDA expansion site <br />Figure 2: Straw wattles placed at lower spill area by culvert