My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-30_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2010-07-30_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:08 PM
Creation date
8/3/2010 12:47:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
INSPECTION
Doc Date
7/30/2010
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
5/27/2010
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPT. OF THE INTERIOR <br />S <br />U <br />. <br />. <br />OFFICE OF SURFACE MINING <br /> Mine Site Evaluation State Program <br /> Permit Field Visit 05/27/2010 Continuation Page <br />Permittee/ TWENTYMILE COAL CO. Number C-036-81/056-82 Date <br />Person <br />28 Performance Standard Categories <br />d <br />. <br />5=Noncompliance Identified Elsewhere, 6=Previously Cite <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, <br />Administrative <br />A D. Backfilling & Grading H. 1 Subsidence Control Plan <br />. <br />1 Mining within Valid Permit <br />1 1. Exposed Openings I. Roads <br />. <br />1 Mining within Bonded Area <br />2 2. Contemporaneous Reclamation 1. 1 Road Construction <br />. <br />3. 1 Terms & Conditions of Permit 3. Approximate Original Contour 2. Certification <br />1 Liability Insurance <br />4 4. Highwall Elimination 3. 1 Drainage <br />. <br />Ownership and Control <br />5 Steep Slopes (includes downslope) 4. 1 Surfacing and Maintenance <br />5. <br />. _ <br />Temporary Cessation <br />6 _ <br />6. Handling of Acid & Toxic Materials 5,- Reclamation <br />. _ <br />AML Rec. Fees -- Non-Respondent <br />7. 7. 1 Stabilization (rills and gullies) J. Signs & Markers <br />_ <br />AML Rec. Fees -- Failure to Pay <br />8. E. Excess Spoil Disposal 1. 1 Signs <br />_ <br />B. Hydrologic Balance 1.- Placement 2. 5 Markers <br />1 Drainage Control <br />1 2._ Drainage Control K. _Distance Prohibitions <br />. <br />1 Inspections & Certifications <br />2 3.- Surface Stabilization L. Revegetation <br />. <br />3. 1 Siltation Structures 4. Inspections & Certifications I.- Vegetative Cover <br />4. 1 Discharge Structures F. Coal Mine Waste 2. Timing <br />(Refuse Piles/impoundments) 1V1 <br />postmining Land Use <br />5. 1 Diversions <br />6. Effluent Limits _ <br />1. 5 Drainage Control N <br />Other <br />7. Ground Water Monitoring . <br />2. 1 Surface Stabilization General <br />8. - Surface Water Monitoring <br />e -- Acid-Toxic Materials <br />Draina <br />9 3. 1 Placement <br />4. 1 Inspections and Certifications Performance <br />g <br />. <br />10. 1 Impoundments 5. 1 Impounding Structures Catagory <br />Stream Buffer Zones <br />11 G. Use Of Explosives - 1) <br />._ <br />C. Topsoil & Subsoil 1. 1 Blaster Certification - <br />2) <br />Distance Prohibitions <br />2. <br />1. 1 Removal - - <br />- <br />Blast Survey/Schedule <br />3 <br />2. Substitute Materials .- <br />Warnings & Records <br />4. <br />3) <br />. <br />3. 1 Storage and Protection - - <br />- <br />Control of Adverse Effects <br />5 <br />. <br />4. Redistribution <br />Performance Standard Catagories E. Excess Spoil Disposal ...........................................(816/817.711(4) <br />e) <br />30 CFR Counterpart 1. Placement ..................................................................... 71 <br />Drainage Control ................................................................................ <br />2 <br /> <br />. <br />A. Administrative .............................................................773....... <br />.......773.11 3. Surface Stabilization ........................................................................... 71(g <br />71(h) <br />1. Valid Permit ......................................................... ..................... <br />4. Inspections &Certifications ............................................................... <br />11 <br />773 <br />2. Mining within Bonded Area ....................... . <br />......................... <br />Coal Mine Waste (Refuse Piles/Impoundments) .....(816/817.81-84) <br />17 F <br />773 <br />3. Terms & Conditions of Permit .................... . <br />. <br />......................... <br />800.60 <br />83(a) <br />4. Liability Insurance ................................................................ <br />1. Drainage Control ............................................................................... <br />78.13 2 <br />Surface Stabilization .......................................................................... 83(b) <br />5. Ownership and Control ............................................... 3 <br /> /81 <br />. <br />6. Temporary Cessation .............................. ant842.1 & 81670.15 31(b) 3. Placement ........................................................................................... <br /> 83(c) <br />............................870.15 4 <br />Inspections and Certifications........................................................... 83(d) <br />7. AML Rec. Fees -- Non-ant <br /> to Pay ........ <br />8. AML Rec. Fees -- Failure to Pay ................ . <br />................... <br />.....................870.15(a) 5. Impounding Structures....................... ••84 <br /> B. Hydrologic Balance ............................... .......(816/817.41-57) G. Use of Explosives .................................................. (816/817.61-68) <br /> 1. Drainage Control ................ .....45 <br />49(a)(10) 1. Blaster Certification........................................................................... 61(c) <br />61(d) <br /> 2. Inspections & Certifications ....................... ................... <br />46 2. Distance Prohibitions ......................................................................... <br />62-64 <br /> 3. Siltation Structures ..................................... ................................. <br />47 3. Blast Survey/Schedule ....................................................................... <br />66 & 68 <br /> 4. Discharge Structures ................................................................... <br />4. Warnings & Records ...................................................................... <br />43 <br />67 <br /> ons.. ........................................... <br />5. ................................. <br />5. Control of Adverse Effects............................................................ ......... <br />42 <br /> 6. E Effluent Limits .......................................................................... <br />Effluent <br />7. Ground Water Monitoring 41(c) H. Subsidence Control Plan .........................................(817.121-122) <br />150-151) <br />(816/817 <br /> 8. Surface Water Monitoring ......:.................. <br />9. Drainage--Acid - Toxic Materials .............. . <br />.............................41(e) I. Roads ................................................................. <br />.............................41(f) 1 .................. <br />Road Construction ...................................................... <br /> 10. Impoundments ........................................... 151(a <br />.................................49 . <br />) <br />............57 2. Certification.................................................................................. . <br />150(b))--1151 51(dd) <br /> 11. Stream Buffer Zones .................................. ..................... <br />................................................................. <br />3. Drainage .............. <br />(816/817.22) 4. Surfacing and Maintenance .................................................. 150(e)-151(d <br /> C. Topsoil & Subsoil ............................................... <br />) <br />22(a) 5. Reclamation ....................... <br /> 1. Removal ..................................................... <br />Substitute Materials ................................... <br />2 ............................. <br />816/817.11) <br />..............................22(c) J. Signs & Markers ....................................................... ( <br /> . <br />3. Storage and Protection .............................................................22(c) <br />4. 1. Signs ..................................................................................... 1 l (a),(b) &(c) <br />Redistribution ..........................................................................22(d) <br />2. Markers ...................................................................... 11(a),(b),(d),(e),&(fl <br /> D. Backfilling & Grading ..............................(816/817.95-107) K Distance Prohibitions ....................................................... (761.11) <br /> 1 L. Revegetation..................................................... (816/817.111-116 <br />1. Exposed Openings .....................816/817.13, 14, 15, & 823.11 &2 <br /> 2. Contemporaneous Reclamation .................. 0 <br />............................... 0 1 . Vegetative Cover....................................................... ..............I ] 1 & 116 <br />102(a)(1) <br />113 <br />1) <br /> . <br />. <br />. <br />. <br />.. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />Contour . <br />Original <br />Approximate <br />3 <br />. ....................... <br />02 a 2 ............................................................ (................ <br />2. Timing.................. . <br />102(a)( <br />()( ) <br /> ......................... <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />............... <br />Elimination <br />Highwall <br />4 <br />. <br />5. Steep Slopes (includes downslope) ............................................107 M. Postmining Land Use.............................................. 816/817.133) <br /> 6. Handling of Acid & Toxic Materials .......... ............................102(c) RevsedDecembe 4, 1998 Page 2 of <br />95(b) <br /> <br />..._ .............. <br />7. Stabilization (rills and gullies).................... <br />.............................. <br />..............................
The URL can be used to link to this page
Your browser does not support the video tag.