Laserfiche WebLink
........................................... ........ ..._..........._......................... <br />ROADABLE EQUIPMENT ..........................,. ,_......................._.........._........._........_....._....._...... sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 5,000 Gal. $24.58 1 $113.25 $88.67 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $113.25 $88.67 <br />.::::::................................................................................................................................................... <br />E ...................................................................... <br />QUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Equipment Equipmen <br />JOB TIME AND COST <br />Total non-roadable mob/demob cost * <br />* two round trips with haul rig <br />Total roadable mob/demob cost ** <br />** one round trip, no haul rig <br />Total job time <br />Total job cost <br />Prtichett <br />27.0 miles <br />55.0 mph <br />$6,531.29 <br />$99.12 <br />4.96 hours <br />6,630