Laserfiche WebLink
00 <br /> x <br /> ? <br />^ <br /> Q <br />00 <br />x <br />o <br />ry <br />O <br />o° <br /> <br />C9 <br />O <br />O <br />+ <br />th <br />N <br />C9 <br />0 <br />O <br />O <br />O <br />OD <br />N <br />U' <br />G32+00 <br />C2 ` <br />x00 <br />cRx <br />DO <br />2+00 ?_„?_ <br /> o LEGEND: <br /> + EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br /> Ib <br /> LLJ PROPOSED GROUND SURFACE CONTOUR EL, FEET <br /> -:':.r == EXISTING UNIMPROVED ROAD/TRIULS <br /> QQ EXISTING IMPROVED ROADWAYS <br /> Ox - EXISTING DRAINAGES <br /> ®SOIL LINER FILL PLACEMENT <br /> OX- ® PREVIOUS SOIL. LINER FILL PLACEMENT <br /> <br /> ryx <br /> <br /> <br />O <br />+ <br /> <br />4! <br /> <br /> ?O <br />2 <br />O <br />O <br /> <br />0 <br />W 0 <br />0 <br /> <br /> <br /> S <br />0 <br />O <br />+ <br />a0 <br />W O <br /> + <br /> <br />° <br /> <br />o <br /> <br />O. f <br />-0 <br />X <br />O <br />w <br />x {i <br /> bc <br /> P? <br />0 <br />/ <br /> oo r a'D'T CRIPPLE CREEK do VICTOR <br /> GOLD MINING COMPANY <br /> <br />PHASE 5 VLF <br />nm <br />PHASE 5 SOIL LINER FILL <br />PLACEMENT <br />DESIGNED By CMT CNECXED BY JON DATE <br />am& DRAWN e7 CMT APPROVED BY JAN 07/10/10 <br />EARTH AND ENVIRONMENTAL cm m N"& 1 noun[ Ne. nLV <br />3 0 <br />s